| NO | Date | clients | PO/ CONTRACT. No. | Subject |
|---|---|---|---|---|
| 1 | 15/01/2008 | MEDCO E & P INDONESIA | 351000 1483 (Ex. BF-2758) | Supply of 1 unit LP Prod Scrubber & 1 unit LP KO Drum-Sembakung Project |
| 2 | 16/01/2008 | SURYA ESA PERKASA | 001/SEP-LOI/1/08 | Supply of TEG Inlet Scrubber V-120 |
| 3 | 15/02/2008 | CONOCOPHILLIPS INDONESIA INC. LTD. | CS-13973789 | Hydrocyclone Retrofit Belida |
| 4 | 28/02/2008 | MEDCO E & P INDONESIA | 3510001559 (ex. BF-2782) | Pengadaan dan Pemasangan Instrument Control dan Safety Shutdown System di St. Koneng |
| 5 | 03/05/2008 | CHEVRON MAKASSAR | 25644 | Sparepart (O=ring for Hydrocyclone) |
| 6 | 13/02/2008 | CONOCOPHILLIPS INDONESIA INC. LTD. | CS-13751493 | Provision of Gelam K-201A/B Compressor Packages |
| 7 | 27/03/2008 | MEDCO E & P INDONESIA | 3510001593 (ex. BF-2910) | Pengadaan 2 Unit Separator dan 3 Unit Scrubber untuk Proyek Lagan Gas Station Development Phase-2 |
| 8 | 29/05/2008 | CHEVRON MAKASSAR | 26680 | Material Disperser & Eductor |
| 9 | 23/06/2008 | TOTAL E&P INDONESIE | 4500005802 | Supply and Installation of Desander Package at HLB-272 SS Well Handil |
| 10 | 27/06/2008 | KODECO ENERGY CO. LTD. | 018/TS/OPS/08 | PROVISION OF A TEST SEPARATOR PACKAGE |
| 11 | 09/07/2008 | MEDCO E & P INDONESIA | 3510001750 (ex. BF-3154) | Pembelian dan Pemasangan 1 Unit Test Separator untuk Project Kaju Oil Development Phase 1 |
| 12 | 15/07/2008 | TOTAL E&P INDONESIE | 4500005891 | Desander Supply and Installation at HRB-338 LS Handil |
| 13 | 15/07/2008 | PETROCHINA INT. JABUNG LTD. | SWBD-184-43-MR-310-01/OR#1506 | Test, Production Separators, Flare KO Drum, Drain Tank and Gas Boot Packages |
| 14 | 15/07/2008 | HESS (INDONESIA-PANGKAH) LIMITED | 543/HIPL/SC/LOI/VII/2008 | Engineering Services for SMT Jetty Fire Fighting Upgrade |
| 15 | 18/07/2008 | JGC/PT. KBRI J/O | R2151-301-A | Tangguh LNG Off-Shore (Spare Parts) |
| 16 | 14/08/2008 | ICO PROCESS | PO-ICO/08/2014 | Body Bucket Strainer |
| 17 | 13/08/2008 | VICO INDONESIA | 38900 | Nilam Satelite #4 VLP Gas Compression Services |
| 18 | 20/08/2008 | VICO INDONESIA | 82555 | Separator Vessel |
| 19 | 04/09/2008 | VICO INDONESIA | 82657 | Nilam Satelite #6 VLP Gas Compression Packages |
| 20 | 17/09/2008 | CIPTA NIAGA GAS | 023/CNG-PRCH/IX/08 | Pembuatan Buffer Gas |
| 21 | 09/09/2008 | PT. FAJAR MAS MURNI | 71-19017-00 | Supply of Skid Baseplate XP100 Rotary Screw Air Compressor |
| 22 | 20/10/2008 | CHEVRON PACIFIC INDONESIA | 13171 R2 WHDRI | Gas Boot & Knock Out Drum for Rangau Degassing Station Project Duri - Riau |
| 23 | 04/11/2008 | ICO PROCESS | PO-ICO/08/2021 | Filter Housing dia 10" x length 450 mm |
| 24 | 24/10/2008 | BP WEST JAVA | STC-0401 | Jasa Teknik untuk Peningkatan System Deteksi Gas di Muara Karang & Tanjung Priok |
| 25 | 11/11/2008 | CHEVRON PACIFIC INDONESIA | 13441 R3WHBKS | Test Tank and Pressure Vessel (Gas Boot) |
| 26 | 24/11/2008 | CHEVRON PACIFIC INDONESIA | 28351 | Separator Package WEMCO (Sparepart) |
| 27 | 20/11/2008 | PT. FAJAR MAS MURNI | 71-19460-00/00683 | 2 Units Air Receiver Tank & 2 sets Skid Base Plate |
| 28 | 20/10/2008 | CAMERON | SP060251 | 2 Units CP2 Ceramic Liner for Krebs Separator & Blank Liner |
| 29 | 30/12/2008 | CHEVRON PACIFIC INDONESIA | 13673 R2WHDRI | Pig Launcher & Receiver |